Regular MIWP-7a virtual teleconference - 20/01/2015

 

Regular virtual teleconference of MIWP-7a - MIG temporary sub-group on Download Services for Observation Data

Meeting overview

This was the second virtual meeting of the MIG sub-group on INSPIRE Download Services for Observation Data (MIWP-7a).

The meeting took place on 20 January 2015 from 14:00 till 15:30.

Agenda

  1. Progress on task 1 “Review of the materials of the Are3na study on SOS” (comments by the sub-group)
  2. Sub-division of tasks and responsibilities
  3. ICT infrastructure - test server(s), issue tracker, etc.
  4. AOB

 

Summary of discussion

The group agrees that priority would be given to use cases which would then reflect lessons learned into the Technical Guidance documentation. Several testbeds and review of the current state of the art of server/client software together with use cases would be organized in order to gain pragmatic evidence of what needs to be reflected within the Technical Guidance documentation. In terms of use cases a standard template will be used to document existing practices, and the information will then be made available through the MIG platform. The testbeds on the other hand will address the TG for Download Services for Observation data from three perspectives (i) Software developers dealing with creation of SOS implementations, (ii) Data providers implementing SOS services, (iii) Availability of clients to utilize the existing INSPIRE download services for observation data.

The sub-group representatives also agreed that some introductory slides about the relevant INSPIRE documentation, as well as the SOS implementation being done by 52 North in 2014 will be presented during the next regular teleconference of the sub-group.

In terms of the update of the TG for Download Services the sub-group representatives agree that this would be done in a stepwise approach with a first round of comments provided to the current version of the document being created within the Are3na study on INSPIRE/SOS. JRC will provide the latest version of the TG including sections for SOS with all changes to the latest official version (3.1) to sub-group participants. Comments will then be provided by the participants through a wiki page set up by JRC.

Decisions

The following actions were agreed during the teleconference:

ID

Action

Responsible

Deadline

Status
Actions from previous meeting(s)

A1.1

Setup a Doodle for the next virtual meeting

AK

2014-12-19

Done

A1.2

Draft a project plan

AK

2015-01-15

Ongoing

A1.3

Review of Are3na study materials

all

2015-01-15

Ongoing

A1.4

Populate the table with tasks (below) with Leaders and Contributors to sub-group tasks

all

2015-01-15

Ongoing, new deadlie 02.02.2015

A1.5

Investigate opportunities for provision of test servers and access for sub-group representatives

AK, SJ

2015-01-15

Done

A1.6

Regular meetings (once a month, priority to be given to virtual)

AK

regular

 

A1.7

Regular reporting to MIG

AK

regular

 

A1.8

Informal Face 2 face meeting during INSPIRE/GWF

Those attending INSPIRE/GWF

2015-05-22

 

A1.9

Organize a meeting, back to back with the HydrologyDWG in Orléans

SG, AK

2015-09-15

 

A1.10

Establish sub-group web space

AK, ML

2014-12-20

 
New actions (20.01.2015)
A2.1 Setup a Doodle for the next virtual meeting AK 2015-01-23  
A2.2 Create a template for documenting use cases AF, AK next regular teleconference (#03)  
A2.3 Provide to sub-group delegates TG proposal (Are3na) with track changes AK 2015-01-23  
A2.4 Create ppt for relevant document for observation data AK, ML next regular teleconference (#03)  
A2.5 Present 52N SOS extensions for INSPIRE SJ next regular teleconference (#03)  
A2.6

Populate the table with tasks (below) with Leaders and Contributors to sub-group tasks

all next regular teleconference (#03)  

 

Work program (draft)

ID

Task

Leader

Contributors

T1

Update and maintain Are3na study materials

TBD

all

T2

Propose and coordinate updates of D 2.9

Sylvain

Pawel, Barbara, Kathi, Paolo, Sylvain

T3

Use cases

Anders

Sylvain, Emmanuel, Paolo, Barbara, Alex

T4

Implementation testbed SOS software

TBD

Barbara, Frederic,

T5

Implementation testbed SOS service with data

TBD

Anders, Sylvain, Kathi, Pawel, Barbara, Diomede

T6

Implementation testbed client-server

Diomede

Diomede

Technical Guidance for INSPIRE Download Services_SOS_Draft.docx (3.84 MB) Alexander Kotsev, 23 Jan 2015 04:59 pm